Production and warehouse system

Receiving in one Excel sheet, production in another, the warehouse in a third — and the answer about one pallet takes hours

Shipping lives in a notebook, the stock level is in the storekeeper's head, and the plant stops for two days for the stock count. When a customer, a certification audit or the tax authority asks which raw material a given pallet was made from, someone sits down to leaf through the logs.

For producers of pellets, briquettes, wood chips, peat, substrates, feed and bulk building materials who work in Excel sheets and paper logs.

Sounds familiar?

A day at the plant without a system

Receiving in an Excel sheet

Raw material arrives, the weight goes onto the delivery note and is retyped into a sheet in the evening. Nobody records the difference between the note and the scale.

A pallet without a number

There are pallets in the warehouse that nobody can reliably trace to a shift or a raw material.

A handwritten label

The label is written with a marker or printed from a separate program, entering the same data a second time.

One person knows the stock

How much finished product is in the warehouse is known to one storekeeper. When that person is on holiday, sales promise on a guess.

A two-day stock count once a year

Once a year the plant stops to count what should be known every day.

An order lost between the shop floor and the warehouse

Sales take the order, the shop floor hears about it by phone, and the warehouse when the truck is already at the ramp.

What we do

Six steps — and what changes after each

  1. 01 / 06

    Receiving with weighing

    Raw material is registered the moment the truck drives in: weighing, delivery note number, moisture mark and a photo. The system calculates the net weight itself.

    What changes

    The difference between the delivery note and the scale is recorded at once instead of surfacing at the end of the month.

  2. 02 / 06

    Production and packing shifts

    The operator opens the shift: a production shift records raw material used and output, a packing shift builds pallets.

    What changes

    You see how much raw material went in and how much product came out — and in which shift the kilograms disappear.

  3. 03 / 06

    A code and a label for every pallet

    A pallet gets a unique code, and the label with a barcode is printed straight from the system on a Zebra thermal printer.

    What changes

    A pallet without a number no longer appears in the warehouse, and nobody writes labels by hand.

  4. 04 / 06

    The warehouse in real time

    Stock by product, quality class and batch; every pallet has a status and a location.

    What changes

    The manager and sales see the stock, not only the storekeeper. A stock count compares against the system instead of counting from zero.

  5. 05 / 06

    Shipping by scanning

    An order becomes a shipping task with a status. At loading it is enough to scan the pallet code — the system adds up the total.

    What changes

    The order is not lost between the office, the shop floor and the warehouse, and you see what is already loaded.

  6. 06 / 06

    Traceability and reports

    From a shipped pallet back to the raw material delivery — one chain with the time and the employee at every action. Any data set can be exported for accounting and management reports.

    What changes

    You answer a customer, an audit or the tax authority within minutes and can show the chain.

What it looks like

Two screens a manager opens in the morning

Batch · PEL-2026-0418
Raw material
Sawdust, delivery #1182
Moisture / ash
7.8% / 0.42%
Produced
24.6 t
Yield from raw material
96.1%
Status
Shipped
Every batch opens down to the raw material.
Warehouse · stock today
Pellets A1, 15 kg bags
612 pallets
Pellets A2, big bags
128 pallets
Briquette batch BR-0207
34.2 t
Reserved for orders
96 pallets
Labels to print
18 queued
Stock by product and batch.

The data shown here is demonstration data, not a client's records. Real screens of the system are in the project description: HWI production and warehouse system

Project

This system already runs at a plant: HWI

For a pellet and fuel briquette plant in Augšlīgatne we built exactly this system, and it runs every day: raw material receiving with truck weighing, production and packing shifts, coded pallets, shipping and label printing on a Zebra printer. Before that the data lived in paper notes and Excel files, and the volumes recorded in production did not match the warehouse stock.

7
system modules
23
pages
5
user roles
14
kinds of tables and views in the database
Read the full project description
Timeline and order of work

Where we start and what you get

  1. First call

    30 minutes online. You tell us how receiving, production and shipping work today; we show the system in action — 15 minutes is enough for the demonstration.

  2. Week one

    We come to the plant and walk the process on site — from the gate to the ramp. Then we settle the scope and name a fixed price.

  3. After two weeks

    The system is set up for your products and batch logic, stock from Excel is imported, label templates are ready. You see it and try it with your own data, while daily work still runs the old way.

  4. After 4–6 weeks

    The system runs on real batches: the printer is connected, operators and warehouse staff are trained, receiving, pallets and shipping happen in the system.

  5. After two months

    The first month of real work is behind you, with us alongside — support in that month is part of the implementation. Whatever proved awkward in daily use is adjusted in that time.

The timeline depends on how many products, warehouses and workplaces have to be covered; we name the exact schedule after week one.

Objections

Four questions asked before a decision

We already have 1C, Horizon or Excel. Why another system?

The accounting program stays where it is — Horizon, Jumis or 1C. It knows invoices and the balance sheet, but not which pallet came from which shift and raw material. We are the operational layer between the gate and the ramp: receiving, production, pallets, warehouse, shipping. Data for accounting goes out as an export, and we import your existing Excel sheets so that nothing has to be entered again.

We have no time for an implementation.

We do most of the work: we come over, go through the process on site, set up the system, import the data, prepare the labels, connect the printer and train the staff. We implement step by step, starting with one process, so that production and the warehouse do not stop. From you we need a person who knows the process and can answer our questions.

What if you disappear?

After full payment, the source code and the intellectual property rights to the developed solution pass to the client. The data can be exported at any time. You choose the hosting — in Latvia, in the European Union or on your own server — so the system is not tied to one supplier.

How much does it cost?

Implementation — from €4,000, the price is fixed once the scope is settled. Maintenance — from €150 a month: hosting, updates and support. The implementation includes going through the process on site, setting up the system for your products and batch logic, importing data from Excel, preparing label templates, connecting the printer, training the staff and support in the first month.

Next step

Let's talk about your plant

A meeting in the calendar

Pick a time that suits you for a 30-minute online call. We will show the system and answer your questions — no obligation.

Book a 30-minute call

Or write to us

If you would rather not put a meeting into someone else's calendar, leave your contacts — we will get back to you on the next working day.